Wastewater Treatment

Much of the information on this page is excerpted and adapted from the EPA Sector Notebook, Profile of the Healthcare Industry.

Regulations

Water regulations establish different permitting programs for direct and indirect wastewater discharges.

  • Indirect discharge refers to wastewater that is sent to a sanitary sewer. Indirect discharges are subject to regulations by the local sewer authority.

Most hospitals are indirect dischargers.

Sewer authorities that serve significant industrial users are required to implement industrial pretreatment programs (IPPs). At present, approximately 1,500 of the nation’s largest municipalities have been required to develop IPPs. Some municipalities have determined hospitals to be significant industrial users.

Most municipalities have established local prohibitions that apply specifically to medical waste discharges. For example, some municipalities have set a prohibition on “all medical waste.” Other prohibitions include, for example, no discharge of discernible body parts, no human remains greater than 0.5 inches in diameter, and/or no radioactive wastes. Municipalities can establish prohibitions to meet their specific needs and interests.

Federal pretreatment regulations prohibit:

  • discharges of fire or explosion hazards
  • corrosive discharges (pH < 5.0)
  • solid or viscous pollutants
  • heat (in amounts that cause the treatment plant influent to exceed 104 degrees F)
  • pollutants that cause toxic gases, fumes, or vapors
  • any other pollutant (including oils and greases) that will interfere with or pass through the treatment plant

There are very few direct-discharging hospitals. For example, in 2004, 11 hospitals in the U.S. had obtained “non-major” NPDES permits, and only one had obtained a major NPDES permit.

NPDES permits are issued either by the EPA or by the state in which a facility is located, in cases where the state has been specifically authorized to implement the NPDES Permit Program. In either case, the overall form of the permit application and the general permit requirements are established under federal regulations. More specific regulations may apply in individual cases, depending on technology-based discharge standards (40 CFR 460) and on water quality standards for the water body receiving the discharge.

Because the numeric limits that apply to a given facility are site-specific, the best way to get more detailed information is to contact the EPA Regional pretreatment coordinator responsible for the region where the facility is located.

Inspections

While an EPA inspector is authorized to examine a wide range of documents and operations, he or she will probably be interested in three areas in particular that relate to Clean Water Act compliance:

  • wastewater discharges
  • stormwater discharges
  • any aboveground or underground oil storage containers

Typical records that an EPA inspector may ask to review include:

  • The Industrial User (IU) permit for discharges to the local municipality.
  • A Spill Prevention, Control, and Countermeasure (SPCC) Plan. The purpose of an SPCC plan is to prevent any discharge of oil into or upon navigable waters of the United States or adjoining shorelines.
  • Phase II stormwater permits, under the NPDES program, for public hospitals located in urbanized areas
  • NPDES construction stormwater permits (Phase I and Phase II), required for any construction activity greater than 1 acre for any hospital located in urban or rural areas.
  • NPDES general permit for discharging directly to a water body.

More Resources

EPA’s Office of Water operates a Water Resource Center with a 24-hour voice mail system for publication orders or reference questions at (202) 566-1729. The staff can be consulted by email at center.water-resource@epa.gov

The Wetlands Helpline is (800) 832-7828.

Visit the EPA Office of Water and the NPDES sites for additional information.